I Manage: Considerations for Optimizing Power within Data Center White Space

March 12, 2018 Power management within the white space—particularly inside the cabinet—is critical to ensure availability of all IT applications, as well as to minimize the overall energy footprint of the data center. Chatsworth Products (CPI) suggests following these key considerations when selecting a PDU.

Simple Web-based Software Simplifies Cabinet Access Management

March 06, 2018

CPI's eConnect Electronic Access Control—a networked locking solution that integrates with eConnect PDUs—required new features, tabs and options to be added to the eConnect software interface for even simpler cabinet access management. Check out the updates in a short video and test drive the software.

8 Do's and Don'ts for Successful Data Center Migrations

December 14, 2017 With the increasing focus on colos and consolidation, data center migrations are more prevalent than ever. Yet every data center manager knows that these moves require careful planning and efficient execution. View Sunbird's infographic to discover tips and tricks to help win at data center moves.

Tech Tip: Breakers Tripping Because of Inadvertent Plugging In of Outlets?

December 12, 2017

Even data center personnel with the best of intentions can bring the network down by inadvertently plugging equipment into an unused outlet. There may be a simple fix. Consider CPI's Switched eConnect® PDU.

New Networked Electronic Access Control Enhances Cabinet Security, Reduces Costs

November 30, 2017 Chatsworth Products (CPI) recently released a new electronic lock solution for physical security of data center cabinets. The Networked Electronic Access Control (EAC) Swinghandle Kit provides remote monitoring of physical security and environmental conditions of a cabinet, while providing significant cost savings.

Evaluating a PDU Technology? Would Saving Thousands on Deployment Costs Help Decide?

November 28, 2017

Take a look at CPI's online savings estimator to see how much you can save with eConnect® PDUs.

Stop by BICSI Booth 601 to Experience the CPI Cabinet Ecosystem

September 20, 2017 Chatsworth Products (CPI) will be showcasing its cabinet ecosystem solution, as well as other innovative products, at the upcoming 2017 BICSI Fall Conference & Exhibition Sept. 24 – 28 at Mandalay Bay Resort and Casino, Las Vegas.

I Protect: Access Control Solution is a Key Element of a Successful Data Center Cabinet Ecosystem

September 07, 2017 As more equipment is collocated or placed in remote sites, the need for security becomes extremely critical. Find out how CPI can help you optimize access control in your cabinet ecosystem.

What’s New: Power IQ® for eConnect® Software, Version 6.0 Release

August 31, 2017 Customers who currently use Chatsworth Products’ (CPI) Power IQ® (PIQ) for eConnect® software can now download Version 6.0. Find out what new features and functionality have been added.

CPI Expert to Deliver Presentation at DataNet BICSI Mexico 2017

July 18, 2017 DataNet BICSI Mexico is just a few short weeks away, August 9-11 in Mexico City and CPI technical expert Victor Banuelos will be presenting. You won't want to miss it.

Visit Chatsworth Products at ChannelCon 2017 in Austin

July 12, 2017 Attending the upcoming ChannelCon 2017 event in Austin, Texas? Get a sneak peak at what you'll see in the booth.

Tech Tip: How to Test Your Failover Capability without Having to Shut Down the Power Chain

June 30, 2017 How do you test your failover capability if you were to lose power?  Do you physically shut down one side of the power chain to see if the systems can handle a failover? If this is your current practice, you’re not alone.

Online Learning Seminar Now Available for Certification and Credits, “Energy Efficiency in Data Centers: The Importance of Airflow Management and Monitoring”

June 29, 2017 What is the data center impact on building design? What are the most effective design approaches that building designers can employ to control their capital and operating costs, spatial needs, and energy consumption? Find out and earn AIA credits with this new course from Chatsworth Products.

CPI's Customizable Industrial Solutions on Display at Intersolar North America

June 23, 2017 Attending Intersolar North America? So are we. Here's a preview of what you'll see in booth 9339.

Tech Tip: Should You Monitor at the Rack Power Distribution Unit (PDU) or Busway System Tap Box Level?

June 21, 2017 Should you monitor at the rack PDU or Busway system tap box level? This is a common question among customers who are looking into rack power monitoring. CPI expert and Sr. Product Manager for Power, Electronics & Software technologies gives us the scoop.

Key Metrics for Data Center Power Monitoring

June 19, 2017 Without knowing which metrics to track and how to leverage your data, the visualizations and dashboards in your DCIM or data center monitoring software are nothing more than pretty pictures. So, what are some of the metrics and analytics you should consider for data center power monitoring?