











Cart
EA-60C4W-CE












Switched Pro eConnect PDU; Redundancy; Vertical; for 42U or Higher Cabinets; NEMA L21-30 Input; Locking (12) C13/C15+(12) QuadLock Outlets; 8.6kW
| Plug | NEMA L21-30P |
| Outlets | (12) C13 + (12) QuadLock |
| Volts | 120/208V |
| Phase | Three-Phase |
| Input Current | 30A |
| kW Capacity | 8.6kW |
| Cabinet Compatibility | 42U or Higher |
| Color | 1 Black + 1 Glacier White |
Product Description
Switched Pro eConnect® PDUs provide remote power monitoring and control for each outlet on the PDU, making it possible to remotely measure and cycle power for each piece of equipment attached to the PDU.
Key Features and Benefits
- Reduced Networking Costs and Complexity – Secure Array® allows the use of a single IP address for up to 48 connected PDUs (32 when electronic locks are integrated). Second IP address for the entire array provides failover capability.
- Resistance to High Temperature – Marketleading temperature ratings of up to 149°F (65°C) ensures reliability when mounted toward hot aisles.
- Simplified Load Balancing – Phase-balance outlets on three-phase models ensure equal loading across all phases; allows use of shorter equipment power cords for better cable and airflow management.
- No Accidental Disconnections – Patented, low-profile locking outlets prevent accidental disconnections without requiring special cords
- Easy Identification of Failover Unit – Redundancy Pack includes 2 PDUs (one in Black and one in Glacier White) for easy identification of the primary and secondary unit.
- Electronic Lock Integration – Patented technology seamlessly integrates PDU, environmental sensors and electronic locks into a single hardware and software solution.
- Gigabit Ethernet – Ensures compatibility with enterprise routers and switches.
- Latest UL Compliance – Meets UL and IEC 62368 for compliance with new listing requirements for North America and the European Union.
- Cabinet Preinstallation – Complete ecosystem ships ready for IT equipment integration, and saves deployment time and reduces packaging waste.
- High Power Configurations – Configurations supporting up to 100A Input provide an optimized solution for GPU & AI based applications. 30A branch circuit breakers provide flexibility when plugging high power IT equipment.
Product Information
Remote Power Monitoring and Control Features
The Switched Pro eConnect® PDU delivers comprehensive remote power monitoring and control for each outlet, enabling precise management of connected equipment in data centers. This capability supports efficient data center power management by allowing administrators to measure and cycle power remotely, reducing downtime and optimizing energy usage. With features like Secure Array® technology, it simplifies networking by using a single IP address for multiple PDUs, enhancing rack power distribution efficiency.
Ideal for high-density environments, this PDU offers phase-balance outlets on three-phase models to ensure equal loading across all phases, which aids in load balancing and improves airflow management. The patented locking outlets prevent accidental disconnections without requiring special cords, adding reliability to your power infrastructure. Additionally, its market-leading temperature rating of up to 149 degrees Fahrenheit (65 degrees Celsius) ensures dependable performance in hot aisle deployments, supporting uninterrupted operations.
Integration with electronic locks and environmental monitoring sensors creates a unified hardware and software solution, enhancing security and situational awareness in data centers. The redundancy pack includes two PDUs in distinct colors for easy identification of primary and secondary units, facilitating quick failover responses. Gigabit Ethernet compatibility ensures seamless connectivity with enterprise networks, making it a robust choice for remote power monitoring and control.
For GPU and AI applications, the PDU supports high-power configurations up to 100A input, with 30A branch circuit breakers providing flexibility for demanding equipment. Cabinet preinstallation options allow for faster deployment and reduced packaging waste, streamlining data center power management. UL and IEC 62368 compliance ensures adherence to latest safety standards, offering peace of mind for North American and European Union deployments.
Overall, the Switched Pro eConnect PDU empowers organizations to achieve superior power distribution unit performance through advanced monitoring and customizable features. By reducing networking complexity and supporting high-temperature environments, it addresses key challenges in modern data centers. Explore how this solution can enhance your rack power distribution and contribute to more efficient, reliable operations.